Determination of economic feasibility of heat supply from NPP for oilfield
DOI:
https://doi.org/10.15276/opu.1.51.2017.08Keywords:
nuclear power complex for oil production, heating network, reduced costsAbstract
The oil production in Ukraine is constantly decreasing. In these conditions it is appropriate to use tertiary methods of intensifying in oil production which increase the mobility of oil. These include a method based on injection into the layer a hot water to raise the temperature of oil that lead to a decrease its viscosity and increase mobility. Aim: The aim of this research is a technical economic feasibility study of constructing and using the nuclear power complex for oil production in order to increase the oil extraction from oilfields in their late stages of production by the example of Okhtyrka oilfield (Ukraine). Materials and Methods: Okhtyrka oilfield is considered the most promising in Ukraine. The explored raw material potential can provide the stable oil production about 2 millions tonnes annually during 50...60 years. On the basis of aerospace photos the oilfield can be divided into three areas which are called North, Central and South. The possible nuclear power plant location selected on the basis of wind rose relative Okhtyrka city and heating networks scheme from NPP to the injection wells. Results: It was developed and designed the key diagram of turbine plant K-1000-5,8/50 with a cogeneration plant which provide the technological coolant for injection into the wells. In rated mode the turbine with cogeneration plant provides 675 t/h of technological coolant at temperature of 250 °C and has electrical power 935.6 MW. As a result of calculating the profit from the sale of electricity and additional oil per year with account of annual operating costs, we determine that the profit equal to 1063.37 millions USD.
Downloads
References
Recovery rates, enhanced oil recovery and technological limits / A. Muggeridge, A. Cockin, K. Webb, etc. // Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences. – 2014. – Vol. 372. – P. 20120320.
Altunina, L.K. Improved oil recovery of high-viscosity oil pools with physicochemical methods and thermal-steam treatments / L.K. Altunina, V.A. Kuvshinov // Oil & Gas Science and Technology – Rev. IFP. – 2008. – Vol. 63, Issue 1. – PP. 37-48.
Butler, R.M. Thermal recovery of oil and bitumen / R.M. Butler. – Calgary: GravDrain Inc., 1997. – 528 p.
Verfondern, K. Potential for nuclear process heat application / K. Verfondern // Proceedings of an International Conference on Non-Electric Applications of Nuclear Power: Seawater Desalination, Hydrogen Production and Other Industrial Applications, 16-19 April 2007, Oarai, Japan. – Vienna: IAEA, 2009. – PP. 26-34.
Burger, J. Thermal methods of oil recovery / J. Burger, P. Sourieau, M. Combarnous. – Houston: Gulf, 1985. – 430 p.
Baibakov, N.K. Thermal methods of petroleum production / N.K. Baibakov, A.R. Garushev. – Amsterdam: Elsevier, 1989. – 209 p.
Клочко, Р.Ю. Економіко-організаційні аспекти реформування нафтогазового комплексу України (на прикладі НГВУ «Охтирканафтогаз») / Р.Ю. Клочко, Н.І. Коваль // Економіка і регіон. – 2012. – № 2(33). – С. 71-74.
Khatib, H. Financial and economic evaluation of projects in the electrical supply industry / H. Khatib. – London: The Institution of Electrical Engineers, 1997. – 199 p.
Rajasekaran, V. Cost accounting / V. Rajasekaran, R. Lalitha. – Delhi: Pearson, 2011. – 819 p.
Абдул Хусейн, А.Р. Выбор схемы и диаметров трубопроводов тепловой сети для нефтяного месторождения / А.Р. Абдул Хусейн, В.П. Кравченко // Пр. Одес. політехн. ун-ту. – 2012. – Вип. 2(39). – С. 130-135.
Киров, В.С. Тепловые схемы турбоустановок АЭС и их расчеты / В.С. Киров. – 2-е изд., испр. – Одесса: Астропринт, 2004. – 212 c.
Кравченко, В.П. Влияние температуры горячей воды, закачиваемой в нагнетательные скважины, на добычу нефти / В.П. Кравченко, А.Ю. Погосов, А.Р. Абдул Хусейн // Восточно-Европейский журнал передовых технологий. – 2013. – № 3/8 (63). – С. 35-39.